Description
Boost your enterprise storage performance with the HPE 3.2TB SAS 12G Mixed Use Solid State Drive (P09094-K21). Engineered for mixed workloads requiring high read/write IOPS, this 2.5-inch Small Form Factor (SFF) SSD leverages a 12Gb/s SAS interface and supports hot-swap functionality with HPE Smart Carrier (SC). Designed to support mission-critical operations like big data analytics, virtualization, and high-performance computing, it offers exceptional endurance of 3 DWPD and Digitally Signed Firmware for added security and reliability. Trust HPEβs extensive testing and qualification process for enterprise-grade assurance.
| Specification | Details |
|---|---|
| Model Number | P09094-K21 |
| Capacity | 3.2 TB |
| Interface | SAS 12Gb/s |
| Form Factor | 2.5" SFF |
| Hot Swap Support | Yes |
| Carrier | HPE Smart Carrier (SC) |
| Random Read IOPS (Max) | 210,000 @ Q32 |
| Random Write IOPS (Max) | 124,000 @ Q16 |
| Endurance (DWPD) | 3 |
| Lifetime Writes | 17,500 |
| Power Consumption | 9.31 Watts |
| Security | Digitally Signed Firmware |
| Dimensions (W x H x D) | 8.63 x 9 x 5.75 in |
| Weight | 1.508 lb |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
