Description
Accelerate read-intensive workloads with the HPE 960GB NVMe x4 Read Intensive SFF SSD (P10208-K21). Designed for high-performance applications such as read caching, social media, email, and boot/swap, this hot-swappable 2.5-inch solid state drive utilizes PCIe Gen3/Gen4 NVMe interface for low latency and ultra-fast data throughput. With 340,000 max random read IOPS and robust data-path error detection, it delivers enterprise-grade reliability and performance in a compact footprint. It features HPE Smart Carrier NVMe support and digitally signed firmware for enhanced data security.
| Specification | Details |
|---|---|
| Part Number | P10208-K21 |
| Capacity | 960 GB |
| Form Factor | 2.5-inch SFF |
| Interface | PCI Express x4 (NVMe) |
| Plug Type | Hot-Pluggable |
| Carrier | HPE Smart Carrier NVMe |
| Read IOPS (Max) | 340,000 @ Q256 |
| Random Read IOPS (4KiB, Q=16) | 115,000 |
| Write IOPS (Max) | 21,500 |
| Random Write IOPS (4KiB, Q=16) | 21,500 |
| Endurance (DWPD) | 0.5 |
| Lifetime Writes (TB) | 876 |
| Power Consumption | 8.72 Watts |
| Firmware | Digitally Signed |
| Dimensions (W x D x H) | 8.63 x 9 x 5.75 in (packaging) |
| Weight | 1.508 lb (packaging) |
| Warranty | 3-Year Warranty |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
