Description
The APC ACRD100 Level 2 Spare Parts Kit (WACFSURD100-SPL2) includes essential components to maintain or service the APC InRow RD ACRD100 cooling units. Designed to support continued performance and uptime, this spare kit ensures fast replacement of critical parts and helps extend system longevity. Ideal for preventive maintenance schedules in data centers and IT environments.
| Specification | Details |
|---|---|
| Part Number | WACFSURD100-SPL2 |
| Kit Type | Level 2 Spare Parts Kit |
| Compatible Model | APC InRow ACRD100 |
| Mounting Mode | Not rack-mountable |
| Unit Height | 6.81 in (17.3 cm) |
| Unit Width | 6.30 in (16 cm) |
| Unit Depth | 6.30 in (16 cm) |
| Unit Weight | 0.79 lb (0.36 kg) |
| Package Height | 27.99 in (71.1 cm) |
| Package Width | 30.98 in (78.7 cm) |
| Package Length | 24.02 in (61.0 cm) |
| Shipping Weight | 54.01 lb (24.50 kg) |
| Warranty | 1 Year Repair or Replace |
| Lead Time | Usually ships within 8 weeks |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
