Description
Optimize your data center's airflow and access control with the Vertiv VC-DR-0002 Swing Door Left Panel, engineered exclusively for the Vertiv Aisle Containment System (VACS). This left-swing door panel enhances thermal efficiency, supports hot/cold aisle containment strategies, and is manufactured to the highest standards by industry leader Vertiv.
With a robust, industrial-grade design, this door panel ensures reliable operation and easy integration with existing VACS setups. Its left-hand swing configuration improves accessibility and allows for strategic placement in high-density environments.
Key Benefits:
-
Seamless integration with VACS infrastructure
-
Left-swing access door for optimal positioning
-
Enhances cooling efficiency and environmental control
-
Durable construction for long-term data center use
-
Easy to install within existing containment systems
| Specification | Details |
|---|---|
| Manufacturer | Vertiv |
| Model Number | VC-DR-0002 |
| Product Type | Left Swing Door Panel |
| System Compatibility | Vertiv Aisle Containment System (VACS) |
| Door Configuration | Left-hand swing |
| Material | Industrial-grade construction |
| Installation | VACS-compatible, field installable |
| Origin | Made in China |
| Warranty | 1 Year |
| Application | Data center aisle containment and access |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
