Description
The APC Metered Rack PDU (AP8866) delivers high-capacity, reliable power distribution with real-time load monitoring. Designed for vertical 0U installation, this PDU supports server, switch, and network device loads via a 208V 3-phase input (IEC 60309 60A 3P+PE) and 18 total outlets—(6) IEC C13 and (12) IEC C19.
It features locking IEC outlets to prevent accidental disconnections and provides data on volts, amps, kilowatts, and kilowatt-hours for energy management. The integrated network management card offers secure remote access via Web, SNMP, and CLI. This model includes a 1-year secure network management subscription and supports environmental monitoring with optional sensors.
Toolless mounting makes it ideal for APC NetShelter enclosures, occupying zero U space and ensuring efficient rack utilization.
| Attribute | Details |
|---|---|
| Product Type | Metered Rack PDU |
| Form Factor | Vertical 0U |
| Input Voltage | 208V, 3 Phase |
| Input Plug Type | IEC 60309 60A 3P + PE |
| Cord Length | 6 ft (1.8 m) |
| Outlets | (6) IEC 60320 C13, (12) IEC 60320 C19 |
| Line Rated Current | 48A |
| Max Load Capacity | 17.3 kW |
| Output Voltage | 208V |
| Frequency | 50/60 Hz |
| Mounting | Rack-mounted, vertical, side-mount |
| Dimensions (H x W x D) | 72.01 x 2.20 x 2.01 in (182.9 x 5.6 x 5.1 cm) |
| Weight | 20.9 lbs (9.5 kg) |
| Environmental Monitoring Port | Yes (Sensor AP9335T/TH, sold separately) |
| Network Interface | Web, SNMP, CLI (1-Year Secure NMC subscription included) |
| Certifications | UL Listed, cUL Listed, VCCI Class A, FCC Part 15 Class A |
| Operating Temp | -5 to 60°C (23 to 140°F) |
| Warranty | 2 years repair or replace |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
