Description
The APC by Schneider Electric PDM3540IEC309-500 is a factory-assembled, touch-safe Power Distribution Module engineered to simplify deployment and expansion of modular PDUs in mission-critical environments. This 500cm 3-pole, 5-wire 40A IEC 309 unit includes a circuit breaker, power cord, power connection, and circuit monitoring, all designed for rapid auto-detection by compatible Modular PDUs. It ensures maximum safety with secure locking connectors and breaker isolation features, while real-time monitoring supports efficient power management in data centers.
| Specification | Details |
|---|---|
| Part Number | PDM3540IEC309-500 |
| Input Voltage | 415 V 3-phase |
| Acceptable Input Voltage | 200–240 V |
| Input Frequency | 60 Hz |
| Maximum Line Current | 40 A |
| Output Voltage | 240 V |
| Max Total Current Draw per Phase | 40 A |
| Power Socket Outlet Type | 1 × IEC 309 |
| Cable Length | 500 cm |
| Color | Gray |
| Dimensions (H × W × D) | 12.7 × 44.4 × 40.6 cm |
| Weight | 6.27 kg (13.82 lb) |
| Certifications | UL Listed |
| Included Accessories | Installation guide |
| Warranty | 1-year repair or replace |
| Environmental | Recyclable packaging, take-back program |
| Lead Time | Usually ships within 3 weeks |
| GTIN | 731304281030 |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
