Description
The APC AP8932 Switched Rack PDU offers advanced outlet-level power control with real-time load monitoring to help data center managers manage energy usage efficiently. Ideal for remote monitoring, reboots, power-up sequencing, and load scheduling, this Zero U PDU features 24 NEMA 5-20R outlets and a NEMA L5-30P input plug, with a 30A rating. Toolless mounting and support for APC's Centralized Management platforms make this unit a smart solution for reliable power distribution and load balancing in modern IT environments.
| Attribute | Details |
|---|---|
| Brand | APC by Schneider Electric |
| Model Number | AP8932 |
| Form Factor | 0U Vertical (Zero U), Toolless installation |
| PDU Type | Switched |
| Input Plug Type | NEMA L5-30P |
| Input Voltage | 100V β 120V |
| Input Frequency | 50/60 Hz |
| Line Rated Current | 24A (input limit 30A) |
| Load Capacity | 2880 VA |
| Output Voltage | 100V β 120V |
| Outlet Quantity & Type | 24 x NEMA 5-20R |
| Cord Length | 9.84 ft (3.00 m) |
| Mounting | Side-mount, Vertical |
| Included Accessories | Installation guide, rack brackets, serial cable |
| Monitoring & Control | Web, SNMP, Telnet, Sequencing, Outlet Switching |
| Certifications | UL Listed, cUL, PSE, FCC Part 15 Class A |
| Warranty | 2-Year Repair or Replace |
| Weight | 17.31 lb (7.85 kg) |
| Dimensions (HxWxD) | 70.51 x 2.17 x 1.81 in (179.1 x 5.5 x 4.6 cm) |
| Environmental Operating Temp | -5 to 60Β°C (23 to 140Β°F) |
| Humidity & Altitude | 5β95%, up to 10,000 ft operating altitude |
| GTIN | 731304307532 |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
