Description
The APC AP7950B Switched Rack PDU delivers advanced power distribution and remote control for critical IT equipment. With 16 IEC C13 outlets, this 0U vertical unit supports 10A, 230V input via IEC C14 plug and offers real-time current monitoring, user-defined alarms, and sequential power cycling for optimized uptime.
It features secure remote management via Web, SNMP, CLI, or Telnet, and integrates seamlessly with StruxureWare Data Center Expert. The AP8000 series also supports real power metering, locking outlets, and environmental sensor ports to ensure comprehensive data center power control and efficiency.
Switched Rack PDU with remote outlet control, real-time monitoring, and secure network management. 0U vertical, 10A, 230V, 16 C13 outlets.
| Category | Details |
|---|---|
| Brand | APC by Schneider Electric |
| Model | AP7950B |
| PDU Type | Switched |
| Form Factor | 0U Vertical Rack-Mount |
| Input Voltage | 200V / 208V / 230V |
| Input Plug Type | IEC 60320 C14 |
| Output Voltage | 230V |
| Outlet Quantity/Type | 16 × IEC 60320 C13 |
| Max Input Current | 10A |
| Load Capacity | 2300 VA |
| Cord Length | 3.05 m |
| Mounting Location | Rear |
| Network Management | Web, SNMP, CLI, Telnet |
| Firmware Upgradable | Yes (Flash upgrade via network) |
| Included Accessories | Mounting brackets, cord retention brackets, toolless kit, manual |
| Certifications | CE, GOST, IRAM, VDE |
| Environmental Range | Operating: -5 to 45°C, Storage: -25 to 65°C |
| Humidity Range | 5% to 95% (Operating & Storage) |
| Dimensions (HxWxD) | 124.5 × 5.6 × 4.4 cm |
| Net Weight | 4.32 kg |
| Warranty | 2 years repair or replace |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
