Description
Maximize your data centerβs efficiency with the APC WITO1YR200R-DIGI Data Center Operation: IT Optimize 1-Year Software License. Designed to support up to 2000 racks, this service provides comprehensive software support to maintain optimal performance. With 1-year coverage and an electronic service delivery model, it ensures consistent system dependability and uptime.
This license enables effective IT asset utilization and provides vital insights to improve power usage effectiveness (PUE), reducing operational costs. Trust APC by Schneider Electric to deliver industry-leading reliability and expert support for your large-scale data center operations.
| Category | Details |
|---|---|
| Brand | APC by Schneider Electric |
| Manufacturer | Schneider Electric SA |
| Manufacturer Part # | WITO1YR200R-DIGI |
| ADI Part Number | 2G-R200RDIG8 |
| Product Type | Service (Software License) |
| Service Duration | 1 Year |
| License Scope | Supports up to 2000 Racks |
| Product Supported | APC Data Center Operation: IT Optimize |
| Support Type | Software Support |
| Service Delivery | Electronic (Digital License) |
| Features | - Reliable issue resolution- Alternative comms channel- Maximizes uptime and productivity |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
