Description
The APC NetShelter Rack PDU Advanced Gen 2 (APDU11250ME) delivers high-efficiency, high-density metered power distribution ideal for modern data centers and enterprise IT deployments. It supports 3-phase input (400V/415V) and distributes up to 11.5kW of reliable power through 42 outlets in a 0U vertical form factor.
Featuring a 4-in-1 combination outlet design (C13/C15/C19/C21), advanced cybersecurity protocols, and seamless EcoStruxure™ IT integration, it ensures flexibility, visibility, and control. With built-in 1% metering accuracy, NMC3 live swap support, and a free 1-year subscription to Secure NMC3, this PDU offers industry-leading performance and resilience.
Key Features
-
Ideal for high-density IT environments
-
Next-gen 4-in-1 outlets support C13, C15, C19, C21
-
Advanced cybersecurity with EcoStruxure™ IT compatibility
-
Supports cascading of up to 32 PDUs
-
1% metering accuracy for precise power tracking
-
Live Swap NMC3 with free 1-year Secure NMC3 subscription
| Specification | Details |
|---|---|
| Model | APDU11250ME |
| Series | NetShelter Rack PDU Advanced Gen 2 (11K Series) |
| Input Voltage | 400V/415V, 3-phase |
| Output Voltage | 240V |
| Load Capacity | 11kW @ 400V / 11.5kW @ 415V |
| Input Plug | IEC 60309 20A 3P+N+PE |
| Input Frequency | 50/60 Hz |
| Cord Length | 3 meters (9.8 ft) |
| Current Rating | 16A (line), 20A (input limit) |
| Outlet Configuration | 21 × combo (C13/C15/C19/C21), 21 × C13/C15 |
| Form Factor | Vertical 0U (rack-mounted) |
| Dimensions (H×W×D) | 1490 × 56 × 55 mm (58.7 × 2.2 × 2.2 in) |
| Weight | 5.7 kg (12.6 lb) |
| Mounting | Side-mountable, rack-mounted |
| Operating Temp | -5°C to 60°C (23°F to 140°F) |
| Humidity Range | 5–95% RH |
| Certifications | UL, CE, CSA, UKCA, FCC, Nemko, PSE, KC, RCM, CMIM |
| IP Rating | IP44 |
| Warranty | 3-Year Repair or Replace |
| Part Number (SKU) | APDU11250ME |
| GTIN | 731304752684 |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
