Description
Keep mission-critical servers, network gear, and edge IT infrastructure running with the APC Symmetra RM SYH2K6RMT-P1.
This 10U rack-mountable, double-conversion online UPS ships at 2 kVA and scales to 6 kVA simply by adding hot-swappable power and battery modules—giving you true N+1 redundancy in minutes, not hours. An integrated 208/240 V-to-120 V step-down transformer lets you support mixed-voltage racks without external gear, while 12 × NEMA 5-20R and 2 × NEMA L6-20R outlets provide flexible distribution.
SmartSlot™, LCD control panel, and a pre-installed Network Management Card 2 deliver local or remote visibility, environmental monitoring, and graceful shutdown. With 85 % efficiency online, 4-hour battery recharge, and 843 BTU/h heat output, the Symmetra RM is engineered for high availability in space-constrained data rooms—and backed by APC’s two-year repair-or-replace warranty, plus optional on-site and extended-coverage plans.
| Category | Attribute | Value |
|---|---|---|
| Capacity & Scalability | Rated / Scalable Power | 2 kVA / 1.4 kW — scalable to 6 kVA / 4.2 kW (N+1) |
| Power Modules (hot-swappable) | 1 included, 4 total slots | |
| Battery Modules | 1 included, accepts up to 4 extra packs | |
| Topology | Architecture | Double-Conversion Online, internal automatic/manual bypass |
| Input | Voltage Range | 155 – 276 V |
| Nominal Voltage / Connection | 208 V, NEMA L6-30P (30 A) | |
| Frequency | 50/60 Hz auto-sensing | |
| Power Factor | 0.98 (full load) | |
| Output | Nominal Voltages | 208 V / 120 V (via integrated step-down transformer) |
| Receptacles | 12 × NEMA 5-20R, 2 × NEMA L6-20R | |
| Waveform | Pure sine wave (< 5 % THD) | |
| Overload / Crest Factor | Up to 5 : 1 | |
| Runtime | Full Load (1.4 kW) | ≈ 12 min 15 s (1 included battery) |
| Recharge Time | ≈ 4 h to 90 % | |
| Management | Interfaces | LCD console, RJ-45 (SmartSlot), EPO |
| Included Card | Network Management Card 2 w/ environmental sensor port | |
| Physical | Rack Units / Form | 10U, 17.52 ″ H × 19.02 ″ W × 28.74 ″ D |
| Weight | 259.6 lb / 117.7 kg | |
| Rail Kit / Brackets | Included | |
| Environment | Operating Temp / Humidity | 0 – 40 °C ; 0 – 95 % RH (non-condensing) |
| Acoustic Noise | 60 dBA | |
| Altitude (operating) | 0 – 10 000 ft | |
| Compliance | Certifications | UL 1778, CSA, FCC Part 15 Class A |
| Warranty | Standard | 2-year repair or replace; optional on-site & extended coverage |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
