Description
The Barco UDM-4K15 (R9409071-B) is a powerful 3-chip DLP projector engineered for large venues demanding brilliant 4K visuals and uncompromising reliability. Delivering 15,000 lumens of brightness and true 4K UHD on-screen resolution (2560 x 1600), the UDM-4K15 ensures stunning image clarity, vibrant colors, and deep contrast, even in demanding environments. With HDR10 support and a laser phosphor light source boasting 30,000 hours of life, it combines longevity with exceptional performance.
Built on Barco’s Pulse electronics platform with Single Step Processing, this projector simplifies setup and provides ultra-fast, low-latency image processing. Its rugged, lightweight design reduces installation and transport costs, while remote monitoring through the Barco Insights Management Suite enables efficient fleet control. Ideal for projection professionals seeking impactful visuals and minimal downtime.
Key Features:
-
15,000 lumens brightness with 4K UHD (WQXGA) resolution
-
HDR10 support for enhanced dynamic range
-
3-chip DLP with laser phosphor light source (30,000-hour life)
-
Remote control (wireless/XLR wired) and advanced fleet management
-
Pulse electronics with low-latency Single Step Processing
-
Eco-friendly design with RoHS certification
-
Designed for large venues and rental/staging applications
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
