Eaton 9155 Emergency Lighting UPS 5.7kW Single-Phase UL 924 208V | BH8KEL2081P100

Save $6,812.01
EatonSKU: BH8KEL2081P100
Eaton Authorized
Google Top Quality Store

Price:
Sale price$17,157.99 Regular price$23,970.00

Shipping calculated at checkout

Stock:
Only 0 units left

Need this as part of a larger AV project? AVENDOR can help with sourcing, installation, support, and monthly payment options

Description

Ensure uninterrupted emergency lighting operation with the Eaton BH8KEL2081P100, a 5.7kW single-phase Eaton 9155 UPS designed for UL 924 emergency lighting applications. Engineered to deliver dependable backup power for life safety systems, this UPS provides clean, continuous power during utility outages, helping maintain code compliance and occupant safety.

Designed for 208V single-phase installations, the Eaton 9155 combines double-conversion online technology with high reliability, making it suitable for commercial buildings, healthcare facilities, educational institutions, industrial environments, and other mission-critical applications where emergency lighting must remain operational.

Its scalable architecture, advanced battery management, and proven Eaton power protection technology provide reliable performance while minimizing downtime and simplifying maintenance.

Key Features

  • 5.7 kW / 5.7 kVA output capacity
  • Online double-conversion UPS technology
  • UL 924 emergency lighting compliant configuration
  • Single-phase 208V input/output
  • Clean, continuous power for emergency lighting systems
  • Advanced battery management for improved battery life
  • High reliability for mission-critical applications
  • Suitable for commercial, institutional, and industrial facilities
  • Eaton 9155 platform for dependable power protection
Specification Details
Manufacturer Eaton
SKU / Model BH8KEL2081P100
Product Series Eaton 9155
Product Type Emergency Lighting UPS
UPS Topology Online Double Conversion
Output Capacity 5.7 kVA / 5.7 kW
Phase Single Phase
Input Voltage 208 VAC
Output Voltage 208 VAC
Compliance UL 924 Emergency Lighting
Application Emergency Lighting Backup Power
Battery Configuration Compatible with Eaton external battery module configuration
Installation Indoor Commercial Installation
Typical Applications Commercial Buildings, Hospitals, Schools, Data Centers, Industrial Facilities

Payment & Security

American Express Apple Pay Diners Club Discover Google Pay Mastercard Shop Pay Visa

Your payment information is processed securely, and we do not store credit card details or access your credit card information.

Return Policy (Short Summary)

We offer a 30-day return window for most unopened, factory-sealed items.

Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.


Some productsβ€”such as custom orders, special-order items, audio gear, software, and LED video wallsβ€”are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.


For damaged or incorrect items, please contact us immediately.


Learn more β†’

275+
Projects Delivered
<2h
Avg Response Time
99.9%
System Uptime
10+
Years in AV
Complete AV Solutions

Building a Complete AV System?

This product is rarely deployed alone. It's typically part of a fully integrated AV system. AVENDOR designs, integrates, and supports end-to-end environments β€” from single rooms to enterprise-wide deployments.

System Design & Engineering
Installation & Integration
Programming & Ongoing Support

Trusted by enterprises, universities, and government organizations across the U.S.

Our Process

From Scope to Sign-Off

A structured delivery process designed to reduce risk and keep projects moving.

01

Plan

Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.

  • Discovery calls & stakeholder interviews
  • On-site survey & infrastructure review
  • Requirements & use-case documentation
  • Project scope, timeline & milestone alignment
02

Engineer

System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.

  • AV system design & signal flow diagrams
  • Equipment selection & BOM development
  • Rack layout & control system design
  • As-built documentation package
03

Deploy

Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.

  • Authorized procurement & logistics coordination
  • Physical installation & cable management
  • Control system programming & configuration
  • Commissioning, testing & end-user training
04

Support

Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.

  • 24/7 remote system monitoring
  • Preventive & reactive maintenance
  • Technology lifecycle & refresh planning
  • Long-term service level agreements

A decade of delivery β€” trusted by 275+ clients across industries