Description
The Eaton 93E 40kVA Tower UPS (model 9EG04GG03001003) is engineered for data centers and IT environments requiring high performance, space efficiency, and maximum uptime. With double-conversion online topology, this UPS delivers consistent, reliable power and industry-leading efficiency of up to 98%. It supports 208V AC input and output, with a robust 32kW/40kVA capacity.
Compact yet powerful, the 93E helps reduce total cost of ownership through extended runtimes, energy savings, and optional internal batteries or external battery cabinets. Its RS-232 interface allows for simple integration and monitoring, while a detachable maintenance bypass ensures uninterrupted power during service.
Ideal for server rooms, small to medium data centers, and critical IT infrastructure.
| Specification | Details |
|---|---|
| Brand | Eaton |
| Model Number | 9EG04GG03001003 |
| Product Series | 93E Series |
| Form Factor | Tower |
| Topology | Double-Conversion Online |
| Capacity | 40,000 VA / 32 kW |
| Input Voltage | 208V AC |
| Output Voltage | 208V AC |
| Efficiency | Up to 98% |
| Interface | RS-232 |
| Color | Black |
| Runtime (Internal Battery) | Up to 21 minutes |
| Runtime (w/ EBC) | Up to 138 minutes |
| Maintenance Bypass | Optional Detachable |
| Dimensions | Varies by configuration (Tower model) |
| Weight | Dependent on configuration |
| Certifications | UL Listed, CSA, RoHS |
| Warranty | Limited warranty (typically 1–2 years) |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
