Description
The Eaton T100H-2500 Power-Suppress 100 is a high-performance line conditioner transformer designed to deliver clean, reliable power in demanding environments. With a capacity of 2500 VA and 93–97% efficiency at max load, this unit supports 120/240V input and output and features a hardwired installation. It is cUL Listed and certified to meet UL and ANSI/IEEE standards, making it ideal for both commercial and industrial applications. Its robust construction includes a 2-year warranty (and 5-year coverage for the core and coil), ensuring long-term durability and protection.
| Specification | Details |
|---|---|
| Model Number | T100H-2500 |
| Product Name | Eaton Power-Suppress 100 |
| VA Rating | 2500 VA |
| Input Voltage | 120/240V |
| Output Voltage | 120/240V |
| Frequency | 63 Hz |
| Topology | Line Conditioner |
| Efficiency at Max Load | 93–97% typical |
| Installation Type | Hardwired |
| Certifications | cUL Listed, UL 1449, UL 1012, ANSI/IEEE Std C57.12.91, ANSI/IEEE Std C62.41 |
| Compliance | Meets FCC Category A |
| Warranty | 2 years (5 years for core and coil) |
| Dimensions (H x W x D) | 17 x 14 x 20 in |
| Weight | 58 lb |
| UPC | 743172021113 |
| Catalog Notes | 120/240V IN, 120/240V OUT |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
