Description
The Eaton Power-Sure 700 TBL-100K-6 is a high-performance metering transformer designed to deliver reliable and efficient power conditioning for sensitive electrical systems. With a 100 kVA capacity, this three-phase transformer features a voltage tolerance of +10% to -20%, delivering output at 208Y/120V. It supports hardwired connections and operates at a typical efficiency of 97%. Ideal for commercial and industrial environments, it includes visual indicators for voltage regulation and over-temperature conditions, and it meets rigorous standards including UL 1012, CSA, FCC Category A, and ANSI/IEEE C62.41.
| Specification | Details |
|---|---|
| Product Name | Eaton Power-Sure 700 |
| Model | TBL-100K-6 |
| Type | Transformer |
| Topology | Line Conditioner |
| Phase | Three-phase |
| Power Rating | 100 kVA |
| Input Voltage | 208 Vac |
| Output Voltage | 208Y/120V |
| Output Connection | Hardwired |
| Efficiency | 97% typical, 95% minimum |
| Bypass | Yes |
| BTU Rating | 11,833 BTU/h |
| Indicators | Voltage regulation (green), over-temp condition (red) |
| Operating Temperature | -10°C to 40°C |
| Dimensions (H x W x D) | 76 in x 34.4 in x 35.5 in |
| Weight | 1,660 lbs |
| Certifications | UL 1012, CSA, FCC Cat. A, ANSI/IEEE Std C62.41 |
| Warranty | 1 Year |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
