Eaton Tripp Lite 3.8kW ATS Monitored Rack PDU, 1U, Dual C20, 8x C13, 2x C19, TAA

Save $489.01
EatonSKU: PDUMNH20HVAT1
Eaton Authorized
Google Top Quality Store

Price:
Sale price$859.99 Regular price$1,349.00

Shipping calculated at checkout

Stock:
In stock (1 unit), ready to be shipped

Need this as part of a larger AV project? AVENDOR can help with sourcing, installation, support, and monthly payment options

Description

The Eaton Tripp Lite PDUMNH20HVAT1 is a high-availability, single-phase ATS monitored rack PDU designed to deliver reliable, network-grade power for mission-critical IT environments. Supporting 200–240V power distribution at up to 3.8kW, this 1U rackmount PDU features automatic transfer switching (ATS) that seamlessly switches between primary and secondary power sources in milliseconds to maintain continuous uptime.

Equipped with eight C13 and two C19 outlets, the PDUMNH20HVAT1 supports mixed IT loads in data centers, network closets, and computer rooms. A built-in network interface enables real-time remote monitoring of voltage, frequency, and load levels via secure web, SNMP, SSH, or telnet access. The front-panel digital ammeter provides at-a-glance load visibility to help prevent overloads and optimize power distribution.

With dual 12-foot C20 input cords, rugged metal construction, and full TAA compliance, this ATS PDU is ideal for government, enterprise, and industrial deployments requiring redundant power and remote visibility.

Specification Details
Manufacturer Eaton Tripp Lite
Model Number PDUMNH20HVAT1
PDU Type Automatic Transfer Switch (ATS), Monitored
Form Factor 1U Horizontal Rackmount
Input Phase Single-Phase
Input Voltage 200 / 208 / 220 / 230 / 240V
Maximum Input Current 20A (16A continuous)
Input Connections (2) IEC C20 (Primary & Secondary)
Input Cord Length 12 ft (3.66 m) each
Output Capacity Up to 3.8kW
Output Receptacles (8) C13, (2) C19
Max Outlet Rating C13: 12A / C19: 16A
Frequency 50 / 60 Hz
Transfer Time 2–7 milliseconds
Load Monitoring Front-panel digital ammeter
Network Management HTML5 web, SNMP, SSH, Telnet
Rack Depth Required Minimum 18.3 in (46.48 cm)
Construction All-metal housing
Operating Temperature 32°–104Β°F (0°–40Β°C)
Compliance TAA, RoHS, CE, FCC Class A
Warranty 2-Year Limited Warranty

Payment & Security

American Express Apple Pay Diners Club Discover Google Pay Mastercard Shop Pay Visa

Your payment information is processed securely, and we do not store credit card details or access your credit card information.

Return Policy (Short Summary)

We offer a 30-day return window for most unopened, factory-sealed items.

Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.


Some productsβ€”such as custom orders, special-order items, audio gear, software, and LED video wallsβ€”are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.


For damaged or incorrect items, please contact us immediately.


Learn more β†’

275+
Projects Delivered
<2h
Avg Response Time
99.9%
System Uptime
10+
Years in AV
Complete AV Solutions

Building a Complete AV System?

This product is rarely deployed alone. It's typically part of a fully integrated AV system. AVENDOR designs, integrates, and supports end-to-end environments β€” from single rooms to enterprise-wide deployments.

System Design & Engineering
Installation & Integration
Programming & Ongoing Support

Trusted by enterprises, universities, and government organizations across the U.S.

Our Process

From Scope to Sign-Off

A structured delivery process designed to reduce risk and keep projects moving.

01

Plan

Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.

  • Discovery calls & stakeholder interviews
  • On-site survey & infrastructure review
  • Requirements & use-case documentation
  • Project scope, timeline & milestone alignment
02

Engineer

System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.

  • AV system design & signal flow diagrams
  • Equipment selection & BOM development
  • Rack layout & control system design
  • As-built documentation package
03

Deploy

Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.

  • Authorized procurement & logistics coordination
  • Physical installation & cable management
  • Control system programming & configuration
  • Commissioning, testing & end-user training
04

Support

Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.

  • 24/7 remote system monitoring
  • Preventive & reactive maintenance
  • Technology lifecycle & refresh planning
  • Long-term service level agreements

A decade of delivery β€” trusted by 275+ clients across industries