Description
The Eaton Tripp Lite SU5000XFMRT2U is a 5kVA / 5kW step-down isolation transformer designed to convert 208V input from UPS systems, utility power, or generators into 120V output for standard equipment. Featuring a robust 2U rack-mountable steel chassis, it includes a 10-ft. L6-30P input cord and provides 12 NEMA 5-15/20R outlets and one L6-30R high-voltage passthrough outlet.
Engineered for secure power delivery and overload protection, the transformer includes four built-in 20A circuit breakers and mounting accessories for 4-post racks. Optional kits support 2-post or tower installations. Ideal for critical power applications in IT environments and data centers.
| Category | Details |
|---|---|
| Model Number | SU5000XFMRT2U |
| Type | Step-Down Isolation Transformer |
| Power Capacity | 5kVA / 5000W |
| Input Voltage | 208V AC |
| Output Voltage | 120V AC (via 5-15/20R), 208V AC (via L6-30R passthrough) |
| Input Plug Type | NEMA L6-30P |
| Input Cord Length | 10 ft. (3.05 m) |
| Output Receptacles | (12) NEMA 5-15/20R, (1) NEMA L6-30R |
| Circuit Protection | (4) 20A breakers (each protects 3 outlets) |
| Form Factor | 2U Rack-Mount or Tower (with optional stand) |
| Included Mounting | 4-post rackmount brackets |
| Optional Accessories | 2POSTRMKITWM (2-post), 2-9USTAND (tower) |
| Material | Steel |
| Unit Dimensions | 3.5 x 17.5 x 20.75 in. (8.9 x 44.5 x 52.7 cm) |
| Unit Weight | 63.5 lbs. (28.8 kg) |
| Shipping Dimensions | 8.6 x 19.9 x 23.4 in. (21.8 x 50.6 x 59.4 cm) |
| Shipping Weight | 74.5 lbs. (33.8 kg) |
| Rack Depth Required | Min. 24 in. (60.96 cm) |
| Environmental | 0β95% RH (non-condensing), 60 Hz |
| Certifications | RoHS compliant |
| Warranty | 2-Year Limited Warranty |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
