Description
The Brocade XBR-G250WPSAC-R is a 250-watt AC power-supply and fan assembly designed for Brocade G620 and G620v2 Fibre Channel Switches.
This hot-swappable FRU delivers dependable system power with integrated cooling, featuring non-port-side intake airflow (port-to-power exhaust). Built for redundant power configurations, it ensures uninterrupted operation and easy maintenance.
Designed under Fabric OS 8.x and 9.x, the XBR-G250WPSAC-R matches Broadcom’s high-reliability standards, supporting intelligent monitoring, thermal protection, and automatic failover.
Ideal for enterprise storage networks that demand continuous uptime and airflow alignment with data-center cooling designs.
| Specification | Description |
|---|---|
| Brand / Manufacturer | Brocade / Broadcom |
| Part Number (Mfr P/N) | XBR-G250WPSAC-R |
| Product Type | Power Supply Module + Fan Assembly |
| Power Output | 250 Watts AC |
| Input Type | AC Power Input |
| Airflow Direction | Non-Port-Side Intake (Port-to-Power Airflow) |
| Compatibility | Brocade G620 and G620v2 Switches |
| Supported Fabric OS | 8.x and 9.x |
| Hot-Swappable | Yes |
| Redundancy Support | Dual redundant configuration with load sharing |
| Cooling Type | Integrated fan assembly |
| Form Factor | Field-Replaceable Unit (FRU) |
| Installation Orientation | Rear (non-port) side |
| Regulatory Compliance | CE, FCC, RoHS, BSMI, KCC, VCCI certified |
| Included Items | 1 × 250 W AC Power Supply (FRU) |
| Country of Origin | Inquire |
| Warranty | Limited 1-Year or per switch support contract |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
