Description
Enhance your UPS runtime with the Vertiv Liebert GXT5-EBC144VRT2U External Battery Cabinet. Designed for seamless integration with GXT5-5000MVRT4UXLN and GXT5-6000MVRT4UXLN UPS systems, this 144V DC lead-acid battery cabinet features a 2U rack/tower form factor and sealed lead acid (SLA) technology. With hot-swappable capabilities and automatic detection, setup is hassle-free. Connect up to 10 cabinets to a single UPS unit for scalable power support.
| Specification | Details |
|---|---|
| Brand | Vertiv Liebert |
| Series | GXT5 |
| Model Number | GXT5-EBC144VRT2U |
| Product Type | External Battery Cabinet |
| Battery Type | Sealed Lead Acid (SLA) |
| Battery Chemistry | Lead Acid |
| Output Voltage | 144 V DC |
| Form Factor | Tower / Rack Mountable |
| Rack Height | 2U |
| Compatibility | GXT5-5000MVRT4UXLN, GXT5-6000MVRT4UXLN |
| Hot-Swappable | Yes |
| Auto Detection | Yes |
| Expandable Runtime | Supports up to 10 EBCs per UPS |
| Shipping Weight | 100 lbs |
| Product Condition | New and Factory Fresh |
| Country of Origin | China |
| TAA Compliant | No |
| Warranty | 3-Year Limited Warranty |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
