Description
The Cisco NCS2K-MF-DEG-5 is a passive 5-degree mesh interconnection module designed for Cisco NCS 2000 Series ROADM architectures. Built for high-density optical transport environments, this module enables interconnection of up to five ROADM line degrees and add-drop components using multifiber MPO connectivity.
Engineered for low insertion loss and high reliability, the NCS2K-MF-DEG-5 integrates optical power monitoring through built-in photodiodes, allowing operators to maintain visibility into signal performance without introducing active components. Its compact, single-slot design supports scalable network expansion while preserving space and power efficiency in metro and long-haul optical networks.
| Specification | Details |
|---|---|
| Manufacturer | Cisco |
| Product Series | Cisco NCS 2000 Series |
| Model / SKU | NCS2K-MF-DEG-5= |
| Module Type | Passive ROADM Mesh Interconnection Module |
| Degree Support | Up to 5 ROADM degrees |
| Connector Type | MPO (8-fiber) |
| Optical Paths | 40 total interconnections |
| Power Monitoring | Integrated photodiodes (per MPO connector) |
| Insertion Loss | Up to 1.5 dB |
| Polarization Dependent Loss (PDL) | β€ 0.1 dB |
| Polarization Mode Dispersion (PMD) | β€ 0.05 ps |
| Return Loss | β₯ 40 dB |
| Form Factor | Single-slot module |
| Power Consumption | Passive (β€ 500 mW for monitoring) |
| Operating Temperature | -5Β°C to 55Β°C |
| Compatibility | Cisco NCS 2000 Series Mechanical Frame |
| Application | ROADM mesh interconnection, optical transport networks |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
