Description
Ensure your critical UPS systems stay operational during emergencies with the Schneider Electric WG5T80K-SPL1 Spare Part Kit. Designed specifically for the MGE Galaxy 5000 80KVA UPS, this Level 1 Emergency Set includes essential components for first-response maintenance and part replacement. Ideal for minimizing downtime in mission-critical environments, the kit is compact and ships within 4 weeks.
| Specification | Details |
|---|---|
| Product Code | WG5T80K-SPL1 |
| Product Type | UPS Spare Part Kit – Emergency Set Level 1 |
| Compatible Model | MGE Galaxy 5000 80KVA |
| Lead Time | Usually ships within 4 weeks |
| Mounting Mode | Not rack-mountable |
| Product Weight | 19.8 lb (9 kg) |
| Product Dimensions (H x W x D) | 25.98 x 12.20 x 10.63 in (66 x 31 x 27 cm) |
| Package Dimensions (H x W x L) | 31.50 x 19.69 x 11.81 in (80 x 50 x 30 cm) |
| Package Weight | 24.641 lb (11.177 kg) |
| Warranty | 1-year (parts only) |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
