Description
The Micron MTFDLAL30T7THA-1BK1DABYYR is a 30.72TB U.2 15mm NVMe SSD from the Micron 9550 PRO series, configured with OCP 2.0 support, TCG Opal self-encryption and 512-byte sectors. It is built on Micron G8 TLC NAND with a PCIe Gen5 x4 single-port interface.
Performance (steady state):
- Up to 14,000 MB/s sequential read and 10,000 MB/s sequential write.
- Up to 2,800K IOPS random 4KB read and 400K IOPS random 4KB write.
- Typical latency of 60 µs read and 11 µs write.
Endurance:
- Rated at 56,064 TB written (4K random) and 201,200 TB (128K sequential).
Technical Specifications:
| Specification | Details |
|---|---|
| MPN | MTFDLAL30T7THA-1BK1DABYYR |
| Series | Micron 9550 PRO |
| Form Factor | U.2 15mm |
| Capacity (Unformatted) | 30.72TB (30,720GB) |
| Extended Firmware | OCP 2.0 + TCG Opal (SED) |
| Sector Size (per MPN) | 512-byte |
| Sequential Read / Write (128KB) | Up to 14,000 / 10,000 MB/s |
| Random Read / Write (4KB) | Up to 2,800K / 400K IOPS |
| Random 70/30 Read/Write (4KB) | 1,100K IOPS |
| Endurance, 4K Random (TBW) | 56,064 TB |
| Endurance, 128K Sequential (TBW) | 201,200 TB |
| Power, Active Read / Write (Max.) | 24 W / 23 W |
| Power, 4K Random Read / Write (Avg.) | 19 W / 23 W |
| Power, 4K 70/30 (Avg.) | 18 W |
| 12V Max. Average Current (RMS) | 4.5 A |
| Dimensions (W x L x H) | 69.85 x 100.45 x 15.00 mm |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
