Description
The Cisco NCS2K-MF-MPO-8LC is a passive auxiliary fan-out module designed for Cisco Network Convergence System 2000 Series optical platforms. It provides reliable mechanical adaptation between MPO-8 and LC fiber interfaces, enabling seamless connectivity between high-density MPO-based ROADM architectures and LC-terminated optical equipment.
Built for carrier-grade environments, this module supports eight LC ports from a single MPO-8 connector while maintaining low insertion loss and integrated optical power monitoring. Its compact, single-slot design fits into the NCS 2000 mechanical frame, delivering efficient fiber management, enhanced visibility, and simplified network operations in metro and long-haul optical networks.
| Specification | Details |
|---|---|
| Manufacturer | Cisco |
| SKU / Part Number | NCS2K-MF-MPO-8LC |
| Product Type | MPO to LC Fan-Out Module |
| Fiber Conversion | 1 Γ MPO-8 to 8 Γ LC |
| Connector Type | MPO-8 (input), LC (output) |
| Monitoring | Integrated optical power monitoring |
| Form Factor | Passive auxiliary module |
| Slot Height | Single-slot |
| Compatibility | Cisco NCS 2000 Series Mechanical Frame |
| Insertion Loss | Low-loss optical design |
| Management Interface | USB-based monitoring and identification |
| Operating Temperature | β5Β°C to 55Β°C |
| Typical Use Case | ROADM fan-out, optical adaptation, fiber management |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
