Description
The Cisco N1K-MD-32E-C is a 32-channel C-band passive mux/demux patch panel designed for high-density optical transport and wavelength-division multiplexing (WDM) deployments. Engineered for Cisco optical line systems, this module enables efficient aggregation and separation of multiple DWDM wavelengths over a single fiber, optimizing fiber utilization and network scalability.
Built for carrier-grade environments, the N1K-MD-32E-C supports precise wavelength management, low insertion loss, and high channel isolation to ensure reliable, high-performance optical transmission. Its passive design eliminates power requirements while delivering predictable optical performance, making it ideal for metro, regional, and long-haul optical networks.
| Specification | Details |
|---|---|
| Product SKU | N1K-MD-32E-C= |
| Product Type | Passive Optical Mux/Demux Patch Panel |
| Number of Channels | 32 |
| Optical Band | C-Band |
| Function | Multiplexing and demultiplexing of DWDM wavelengths |
| Deployment Type | Rack-mount |
| Architecture | Passive (no power required) |
| Connector Type | LC optical interfaces |
| Channel Spacing | DWDM standard spacing |
| Use Case | Metro, regional, and long-haul optical networks |
| Compatibility | Cisco optical transport platforms |
| Installation | Front-accessible patch panel design |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
