Description
The Lenovo ThinkSystem NVIDIA BlueField-3 B3220 VPI QSFP112 2-Port 200G PCIe Gen5 x16 Adapter (with Tin Plating Connector) is a DPU (data processing unit) network adapter delivering 200G Ethernet/InfiniBand connectivity, designed for offloading networking, storage, and security functions in Lenovo ThinkSystem SR665 V3 servers.
Product Highlights
- 2-port 200G VPI (Ethernet/InfiniBand) connectivity
- QSFP112 connector, Tin Plating design
- NVIDIA BlueField-3 DPU technology
- PCIe Gen5 x16 host interface
- Compatible with the Lenovo ThinkSystem SR665 V3
Technical Specifications
| Specification | Details |
|---|---|
| Brand | Lenovo (NVIDIA) |
| Manufacturer Part Number | 4XC7B08942 |
| Feature Code | CCVX |
| Product Type | DPU Network Adapter |
| Controller | NVIDIA BlueField-3 B3220 |
| Network Speed | 200G VPI (Ethernet/InfiniBand) |
| Ports | 2x QSFP112 |
| Host Interface | PCIe Gen5 x16 |
| Maximum Quantity | 2 |
| Compatibility | Lenovo ThinkSystem SR665 V3 |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
