Description
The Eaton Tripp Lite PDU3EVSR10L2130 is a high-performance 10 kW 200β240 V 3-phase switched rack PDU designed for advanced power distribution, monitoring, and control in data centers and enterprise network environments. Featuring 30 switched outlets (24 Γ C13, 6 Γ C19) and a NEMA L21-30P input plug with a 3 m power cord, it provides exceptional flexibility for managing connected equipment.
The built-in Gigabit LX Platform interface (WEBCARDLX) with HTML5-based PowerAlert Device Manager (PADM20) allows secure, Java-free remote management via HTTPS, SNMP, SSH, or Telnet. Users can control, reboot, or lock out individual outlets remotely, enabling proactive load management and reduced downtime.
A vibrant color touchscreen LCD delivers Β±1 % billing-grade accuracy for monitoring per-phase and per-outlet current, wattage, and voltage. The unit also generates a QR code for quick mobile access and integrates with optional EnviroSense2 environmental sensors. Constructed from durable metal, the 0U vertical-mount PDU fits standard EIA 19-inch racks and is TAA compliant, making it ideal for government or enterprise deployments requiring precise, network-grade power management.
| Category | Specification |
|---|---|
| Model Number | PDU3EVSR10L2130 |
| Power Capacity | 10 kW (240 V), 9.6 kW (230 V), 9.1 kW (220 V), 8.6 kW (208 V), 8.3 kW (200 V) |
| Input Type | NEMA L21-30P, 3-Phase, 200β240 V AC |
| Input Cord Length | 10 ft (3.05 m) |
| Maximum Input Current | 24 A (agency-derated continuous) |
| Output Outlets | 30 total (24 Γ C13, 6 Γ C19) |
| Output Voltage | 200β240 V AC |
| Overload Protection | Three Γ 20 A circuit breakers (one per load bank) |
| Monitoring Accuracy | Β±1 % (billing-grade for Amps/Volts/Watts) |
| Network Interface | Pre-installed WEBCARDLX (Gigabit Ethernet) with PADM20 |
| Supported Protocols | IPv4/IPv6, HTTP/HTTPS, SNMP (v1/v2c/v3), SSH, Telnet, FTP, DHCP, NTP |
| Display | Color touchscreen LCD with QR code mobile access |
| Communications Ports | 1 Γ RJ-45 (network), 1 Γ RJ-45 (config), 2 Γ USB-A (for EnviroSense2 modules), 1 Γ USB-B (config console) |
| Material | Heavy-duty metal enclosure |
| Mounting Type | 0U vertical rackmount (with brackets and tool-less buttons) |
| Rack Height | 0U (1.8 m tall) |
| Dimensions (H Γ W Γ D) | 70 Γ 2.17 Γ 2.86 in (177.8 Γ 5.5 Γ 7.3 cm) |
| Weight | 20.01 lb (9.08 kg) |
| Operating Temperature | 0 β 50 Β°C (32 β 122 Β°F) |
| Relative Humidity | 5 β 95 % non-condensing |
| Compliance | UL 60950-1, CSA, NOM, FCC Part 15 Class A, RoHS, TAA |
| Warranty | 2-Year Limited Warranty |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
