Description
Upgrade your QNAP server performance with the QNAP 64GB DDR4 SDRAM Memory Module, designed for high-reliability and heavy workloads. Running at 2400MHz with ECC (Error-Correcting Code) technology, this LRDIMM module ensures superior stability and data integrity for mission-critical applications. Packaged in retail form for immediate installation, it’s fully compatible with QNAP enterprise systems like the TDS-16489U Dual CPU series, making it ideal for virtualization, large databases, and intensive multitasking.
| Specification | Details |
|---|---|
| Manufacturer | QNAP Systems |
| Part Number | RAM-64GDR4ECS0LR2400 |
| Memory Size | 64 GB |
| Memory Type | DDR4 SDRAM |
| Memory Speed | 2400 MHz |
| Error Checking | ECC (Error-Correcting Code) |
| Form Factor | LRDIMM |
| Package Type | Retail |
| Compatibility | QNAP TDS-16489U Dual CPU and compatible systems |
| Condition | New and Factory Fresh |
| Shipping Weight | 1 lb |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
