Description
The Quantum LTO Ultrium 9 Data Cartridge 20-Pack provides high-capacity, reliable tape media for long-term backup, archive, and data protection environments. Each LTO-9 cartridge supports up to 18TB native capacity and up to 45TB compressed capacity, helping reduce the number of cartridges needed for large-scale storage.
Built for dependable performance, Quantum LTO-9 media is designed to resist physical and electronic damage while supporting durable data retention for years or decades. This 20-pack is ideal for businesses needing cost-efficient, scalable tape backup for SMB, enterprise, and archival workflows.
| Specification | Details |
|---|---|
| Brand | Quantum |
| SKU | MR-L9MQN-20 |
| Product Type | Data Cartridge |
| Tape Format | LTO Ultrium 9 / LTO-9 |
| Pack Quantity | 20 Cartridges |
| Native Capacity | 18TB per cartridge |
| Compressed Capacity | 45TB per cartridge |
| Storage Technology | LTO-9 Tape |
| Use Case | Backup, archive, and long-term data storage |
| Durability | Resistant to physical and electronic damage |
| Compatibility | LTO-9 tape drives and libraries |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
