Description
The Quantum Scalar i3 IBM LTO-9 Tape Drive Module delivers high-capacity, enterprise-grade tape storage for backup, archive, and long-term data retention environments. With 18TB native and up to 45TB compressed capacity per cartridge, it helps organizations manage growing data volumes with reliable LTO-9 performance.
Designed as a half-height internal drive module for Scalar i3 systems, this unit features a 12Gb/s SAS interface and linear serpentine recording technology for dependable data throughput. It is ideal for businesses that need scalable, cost-effective offline storage and secure backup infrastructure.
| Specification | Details |
|---|---|
| Brand | Quantum |
| SKU | LSC33-ATDX-L9NA |
| Product Type | Tape Drive Module |
| Compatibility | Quantum Scalar i3 |
| Drive Technology | IBM LTO-9 |
| Form Factor | Half-Height |
| Storage Capacity | 18TB Native / 45TB Compressed |
| Interface | 12Gb/s SAS |
| Drive Configuration | Single Module |
| Recording Method | Linear Serpentine |
| Installation Type | Internal |
| Use Case | Backup, Archive, Long-Term Data Retention |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
