Description
The Server Technology® PRO2 Switched PDU C1W24VS-YCFA11C9 is engineered for high-density data center environments requiring advanced monitoring and reliable power distribution. This 30A, 208V three-phase Primary PDU provides 24 outlets with precise per-phase LED current monitoring to prevent overloads and simplify load balancing.
With its hot-swappable network card, outlet-level switching, and support for environmental monitoring probes, it empowers IT administrators to remotely control, monitor, and optimize power usage through HTTP/HTTPS, SNMP, SSH, and CLI interfaces. Featuring high retention locking outlets, flexible mounting, branch circuit protection, and color-coded chassis options, the C1W24VS-YCFA11C9 ensures safe, efficient, and scalable power management in mission-critical rack deployments.
Ideal for data centers seeking redundancy, intelligent monitoring, and remote power control, this model can also be linked to a Switched Link PDU (C1X24VS-YCFA11C9) for expanded circuit management using a single IP address.
| Category | Details |
|---|---|
| Manufacturer | Server Technology (Legrand) |
| Product Series | PRO2 Switched PDU |
| Model / SKU | C1W24VS-YCFA11C9 (Primary) |
| PDU Type | Switched, Monitored |
| Phase | Three-Phase |
| Input Voltage | 208V AC |
| Input Plug | NEMA L21-30P |
| Input Current (Rated) | 24A |
| Input Current (Max) | 30A |
| Power Capacity | 8.6 kW |
| Outlets | (18) IEC 60320 C13, (6) IEC 60320 C19, (1) NEMA 5-20R Utility |
| Branch Circuit Protection | (6) x 20A fuses (Bussmann SC-20, 100 kAIC interrupt rating) |
| Network & Protocols | HTTP/HTTPS, SNMP v2/v3, SSH, Telnet, LDAP/LDAPS, RADIUS, TACACS+, FTP/SFTP, Syslog |
| Connectivity | 10/100/1000 Mbps Ethernet, RS-232 serial, Link port |
| Environmental Monitoring | Supports 2x temperature/humidity probes (optional), SNMP/email alerts |
| Physical Dimensions | 69.0” H x 1.75” W x 2.25” D (1753 x 45 x 58 mm) |
| Operating Environment | 32°F to 122°F (0°C to 50°C), 8–90% RH, ≤ 6500 ft (2 km) elevation |
| Certifications | UL 62368-1, CSA C22.2 No. 62368-1, FCC Part 15 Class A, CAN ICES-003 Class A |
| Warranty | 2-Year Limited (parts & labor), extended support available |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
