Description
The Server Technology® PRO2 SEV-6521D Switched POPS PDU is a high-density power distribution solution designed for mission-critical data centers. With 48 outlets, advanced PIPS® and POPS® technology, and switched outlet control, this rack-mountable PDU ensures precise power monitoring, load balancing, and reliable connectivity.
Featuring billing-grade accuracy for voltage, current, active power, and accumulated energy, IT teams gain full visibility into power usage. Integrated support for Ethernet 10/100, RS-232, and SNMP provides seamless network management. Temperature and humidity monitoring (via optional probes) enhances environmental awareness.
Built with a 3-phase, 4-wire delta input (IEC 60309 60A), the unit delivers 17.3 kW at 208V AC, providing efficient, reliable power for demanding rack environments. Designed for North America, the PRO2 SEV-6521D is an ideal choice for organizations requiring dependable, scalable, and intelligent rack power distribution.
| Specification | Details |
|---|---|
| Manufacturer | Server Technology (Legrand) |
| Product Line | PRO2 |
| Model | SEV-6521D |
| Product Type | Switched POPS PDU |
| Rack Mountable | Yes |
| Input Voltage | AC 208 V |
| Power Capacity | 17.3 kW |
| Input Connector | IEC 60309, 60A, 3-phase 4-wire delta |
| Output Connectors | 48 × IEC 60320 C13 |
| Network Interfaces | Ethernet 10/100, RS-232 |
| Monitoring Features | PIPS® & POPS® (current, voltage, power, energy, PF, crest factor) |
| Environmental Sensors | Supports optional temp/humidity probes |
| Form Factor | 0U Rack-mountable |
| Region | North America |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
