Description
The Vertiv™ SmartRow™ 2 SR2N03020NAA1 is a fully integrated, row-based IT infrastructure solution featuring 3 IT racks, supporting up to 20 kW of critical IT load. It includes in-row cooling, power management, structured cabling, and intelligent monitoring — all within a secure, self-contained system. Engineered for edge and modular data center deployments, this SmartRow™ model simplifies installation, minimizes footprint, and accelerates time to deployment.
| Specification | Details |
|---|---|
| Model Number | SR2N03020NAA1 |
| Rack Quantity | 3 |
| Maximum IT Load | 20 kW |
| Power Input | 208V, 3-Phase, 4-Wire + PE |
| Power Redundancy (UPS/rPDU) | None (Single Feed) |
| Cooling Redundancy | None (Single Cooling Path) |
| Main Input Breaker | 175A |
| Breaker per Condenser | 15A |
| Cooling Units | Integrated in-row system |
| Dimensions (L x D x H) | 2700 mm x 1400 mm x 2271 mm (106.3 x 55.2 x 89.4 in) |
| System Weight (Approx.) | 1863 kg (4108 lbs) |
| Minimum Staging Area | 18.46 m² (198.8 ft²) |
| Environment Conditions | Indoor; 5°C to 40°C; RH ≤ 80%; Max Dew Point: 28°C |
| Installation Requirements | Level floor, no drains or raised tile gaps, no sprinkler heads within 0.5m |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
