Description
The Vertiv™ SmartRow™ 2 SR2N03020PAA1 is a fully integrated, modular data center solution with three IT racks and 20kW capacity designed for high-efficiency edge deployments. Operating on a 208V 3-phase, 4-wire+PE configuration, it delivers internal 2N power redundancy with dual power paths and includes two in-row cooling units (non-redundant). Cold aisle containment ensures optimal airflow management while a built-in power distribution system protects against surges and simplifies installation. Ideal for rapid edge deployments where reliability, space efficiency, and manageability are key.
| Specification | Details |
|---|---|
| Model Number | SR2N03020PAA1 |
| Rack Count | 3 IT Racks |
| Max Power Capacity | 20 kW |
| Input Voltage | 208V, 3-Phase, 4-Wire + PE |
| Power Redundancy | 2N UPS & 2N rPDU |
| Cooling Redundancy | No cooling redundancy (2 CRVs) |
| Cooling Type | In-Row CRV with Cold Aisle Containment |
| Cooling Units | 2x Liebert CRV Units (Non-redundant) |
| Main Input Breaker Size | 175A |
| Condenser Breaker Size | 15A |
| Weight | 1,905 kg (4,201 lbs) |
| Dimensions (L x D x H) | 2700 x 1400 x 2271 mm (106.3" x 55.2" x 89.4") |
| Minimum Staging Area | 20.51 m² (220.8 ft²) |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
