Description
The Lenovo 02JH833 Ultrium 9 Data Cartridge 5-Pack provides high-capacity tape media for reliable backup, archiving, and long-term data retention. Designed for LTO 9 tape drives, each cartridge supports up to 18 TB of native storage capacity, making it suitable for enterprise data protection and archival environments.
This 5-pack is compatible with the IBM TS4300 Tape Library and includes five unattached barcode labels for streamlined media identification and library management. LTO 9 technology delivers dependable, scalable storage for organizations managing growing backup and retention requirements.
Technical Specifications
| Specification | Details |
|---|---|
| Brand | Lenovo |
| Part Number / SKU | 02JH833 |
| Feature Code | BLW1 |
| Product Type | Data Cartridge |
| Tape Technology | LTO Ultrium 9 |
| Media Generation | LTO 9 |
| Native Capacity | 18 TB per cartridge |
| Package Quantity | 5 Cartridges |
| Supported Tape Drive | LTO 9 |
| Barcode Labels | 5 Unattached Barcode Labels Included |
| Compatible Library | IBM TS4300 Tape Library |
| Application | Backup, Archiving & Long-Term Data Storage |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some products—such as custom orders, special-order items, audio gear, software, and LED video walls—are non-returnable. Non-defective returns may be subject to a 20–30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery — trusted by 275+ clients across industries
