Description
The Lenovo 4C57A97269 is a Gigabit Network Management Card G3 designed as an optional management accessory for compatible Lenovo rack or tower uninterruptible power supplies.
The card adds network management capability to supported UPS configurations and is designed for use with Lenovo RT1.5kVA and RT3kVA 2U Rack or Tower UPS-G2 systems.
Product Highlights
- Gigabit Network Management Card
- Generation 3 design
- UPS network management accessory
- Compatible with supported Lenovo UPS-G2 systems
- Supports RT1.5kVA and RT3kVA configurations
- Feature code C70P
Technical Specifications
| Specification | Details |
|---|---|
| Brand | Lenovo |
| Manufacturer Part Number | 4C57A97269 |
| Product Type | UPS Network Management Card |
| Generation | G3 |
| Network Type | Gigabit |
| Application | UPS Network Management |
| Compatible UPS Family | RT1.5kVA and RT3kVA 2U Rack or Tower UPS-G2 |
| Feature Code | C70P |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
