Description
The Vertiv DCE Rack System (E42811) is a robust and scalable 42U enclosure built for data centers demanding high performance, security, and ease of deployment. With a wider 800-mm frame, it offers additional space for cable management and airflow, while supporting a static load of up to 3000 lb. Made from durable black powder-coated steel, this rack is designed for PDU and server integration and comes complete with locking side panels, rear perforated doors, and included mounting hardware for fast and secure installation.
| Specification | Details |
|---|---|
| Brand | Liebert (Vertiv) |
| Series | DCE |
| Model Number | E42811 |
| Product Type | Rack Cabinet |
| Application | PDU, Server |
| Rack Height | 42U |
| Rack Width | 19" |
| External Dimensions (H x W x D) | 78.7" x 31.5" (800mm) x 43.3" (1100mm) |
| Material | Steel |
| Finish | Black Powder Coat |
| Dynamic/Rolling Weight Capacity | 2500 lb |
| Static/Stationary Weight Capacity | 3000 lb |
| Included Accessories | 2x EIA Rails, Perforated Doors, Lockable Panels |
| Additional Features | Casters, Leveling Feet, Cable Entry Top Cover |
| Country of Origin | United States |
| Product Condition | New and Factory Fresh |
| Shipping Weight | 445 lbs |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
