Description
The Lenovo X8-8 ICL Blade with 8x Gen 8 2km OSFP Transceivers is an Inter-Chassis Link (ICL) blade enabling long-distance Brocade UltraScale connectivity between Gen 7 or Gen 8 directors, supporting scalable core-edge and full-mesh fabric topologies for the Lenovo X8-8 Gen 8 Fibre Channel Director.
Product Highlights
- 8x Gen 8 ICL ports with 2km OSFP transceivers included
- Sold in pairs for X8-8 Directors
- Enables long-distance UltraScale fabric topologies
- Maximum of 2 pairs (mix allowed) per X8-8 Director
Technical Specifications
| Specification | Details |
|---|---|
| Brand | Lenovo (Brocade) |
| Manufacturer Part Number | 4C57B07518 |
| Feature Code | CBUB |
| Product Type | Inter-Chassis Link (ICL) Blade |
| Port Count | 8x Gen 8 |
| Transceiver Distance | 2km |
| Maximum Quantity | 2 Pairs (Mix Allowed) |
| Compatibility | Lenovo X8-8 Gen 8 Fibre Channel Director |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
