Description
The LG GPPA062-GB is an outdoor stadium perimeter DVLED cabinet from the GPPA Series, with a 6.25 mm pixel pitch and single SMD pixels.
Display:
- The 1,600 x 660 x 120 mm aluminum cabinet holds eight 400 x 300 mm modules (4 x 2).
- It has a 1,600 x 600 mm screen area, a 256 x 96 resolution, and weighs 69.7 lbs.
- Up to 6,000 nits of brightness keeps content visible in direct sunlight.
- A 7,680 Hz refresh rate reduces black bars, blurring and flicker during video playback.
- 16-bit processing with HDR10 and HDR10 Pro, and a 6,000:1 contrast ratio.
Stadium design:
- Built to meet the LED technical specification requirements UEFA announced as of July 2024.
- Protective elements, including an EVA top, a rubber louver and cushioning, help protect players.
Durability, service and control:
- Rated IP65 front and IP54 rear, with front and rear service access.
- Works with the LG CVGA system controller.
Technical Specifications:
| Specification | Details |
|---|---|
| Brand | LG |
| MPN | GPPA062-GB |
| Series | GPPA Series (Outdoor Perimeter) |
| Pitch Name | P6.2 |
| Pixel Configuration | Single SMD |
| Pixel Pitch | 6.25 mm |
| Module Resolution (W x H) | 64 x 48 |
| Module Dimensions (W x H) | 400 x 300 mm (15.7 x 11.8 in) |
| Weight per Module | 1.46 kg (3.2 lbs) |
| Modules per Cabinet (W x H) | 4 x 2 |
| Cabinet Resolution (W x H) | 256 x 96 |
| Cabinet Dimensions (W x H x D) | 1,600 x 660 x 120 mm (62.9 x 25.9 x 4.7 in) |
| Screen Area (W x H) | 1,600 x 600 mm |
| Cabinet Surface Area | 0.96 mΒ² (10.3 ftΒ²) |
| Weight per Cabinet | 31.6 kg (69.7 lbs) |
| Weight per Unit Area | 29.95 kg/mΒ² (6.1 lb/ftΒ²) |
| Physical Pixel Density | 25,600 pixels/mΒ² |
| Cabinet Flatness | Β±0.5 mm |
| Cabinet Material | Aluminum |
| Service Access | Front and rear |
| Max Brightness (After Calibration) | Up to 6,000 nits |
| Color Temperature | 3,200 to 9,300 K (default 6,000 K) |
| Viewing Angle (H x V) | 160Β° x 120Β° |
| Brightness Uniformity | 97% |
| Color Uniformity | Β±0.003 Cx, Cy |
| Contrast Ratio | 6,000:1 |
| Processing Depth | 16-bit (HDR10, HDR10 Pro) |
| Max Power Consumption | 720 W |
| Avg. Power Consumption | 240 W |
| Max Power Consumption per mΒ² | 750 W/mΒ² |
| Power Supply | 100 to 240 VAC |
| Frame Rate | 50 / 60 Hz |
| Refresh Rate | 7,680 Hz |
| Lifetime (Half Brightness) | 100,000 hours |
| Operating Temperature | -20Β°C to 50Β°C (-4Β°F to 122Β°F) |
| Operating Humidity | 10% to 90% RH |
| IP Rating (Front / Rear) | IP65 / IP54 |
| Certifications | CE, CB, BS476 Part 7 Class 1, EN 13501-1 Class B |
| Environmental | RoHS, REACH |
| Controller | CVGA |
| 90Β° Corner Cut | No |
| Warranty | 3-year limited |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
