Description
The Vertiv Geist NU30002L is a 24-outlet switched PDU designed for high-performance power distribution and intelligent monitoring. Featuring 21 C13 and 3 C19 U-Lock IEC outlets, this vertical, rack-mountable 0U PDU supports 3-phase power input with NEMA L21-20P. With real-time environmental monitoring, IP-based outlet control, and Visible Light Communication (VLC) for handheld power data capture, it ensures secure, scalable, and future-ready infrastructure. The Interchangeable Monitoring Device (IMD) allows for easy hot-swap upgrades. Ideal for modern data centers.
| Feature | Details |
|---|---|
| Manufacturer | Vertiv |
| Brand Name | Geist |
| Model | MNU3EGB0-24PK38-2TL21A0A10-S-A |
| Part Number | NU30002L |
| Product Type | Switched PDU |
| Mounting Orientation | Vertical |
| Mount Type | Rack-mountable |
| Rack Height | 0U |
| Number of Outlets | 24 |
| Receptacle Types | 21 x U-Lock IEC 60320 C133 x U-Lock IEC 60320 C19 |
| Plug/Connector Type | 1 x NEMA L21-20P |
| Phase | Three Phase |
| Input Voltage | 120 V AC, 230 V AC |
| Output Voltage | 208 V AC |
| Input Current | 20 A |
| Power Rating | 5700 W |
| Network Interface | RJ-45 |
| Remote Switching | Yes |
| Management Protocols | DHCP, HTTP/HTTPS, IPv4/IPv6, LDAP, NTP, RSTP, SSH, SMTP, SNMP (v1/v2c/v3), Syslog |
| VLC Monitoring | Yes (via Geist Mobile App) |
| IMD Upgradeable | Yes |
| Width / Depth / Length | 2" / 2" / 66.3" |
| Shipping Weight | 18 lbs. |
| Warranty | 5-Year Limited Warranty |
| Product Condition | New and Factory Fresh |
| Package Contents | PDU, Vertical Mounting Bracket Kit |
| Country of Origin | United States |
| Eco-Friendly | Yes |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
